Saturday, June 23, 2007


We looked at the house today and found that all the wiring is done and the insulation is in. They have started locking the doors so we had to find an open window to lift Micah through so he could unlock the front door.

Recessed lighting in the kitchen.

View from family room back into the kitchen nook.

Pot ledge above front entry closet.

Pot ledge in kitchen nook.

Pot ledge in family room.

Monday, June 18, 2007






I thought I should put other pictures besides the house on this site. These are some pictures from Ellie's birthday party last month and one of my favorite pictures of the kids playing outside.

We now have windows and a front door!

They've started the plumbing. This is the laundry room.

Micah's room

Ellie's room

Thursday, June 14, 2007

We have a roof!


In the last week, the interior walls have been framed and the roof was added. Things are moving along nicely. It looks great!

West side of house(kitchen nook window)

Back of the house

Dormer window in living room can be seen from the dining area and living room.

View from back door looking into the living room/ kitchen area.

View from the front door up at the vaulted ceiling above the kitchen.

View from inside the garage looking into the bedrooms.

Monday, June 4, 2007





We have exterior walls! On June the 1st they started framing in the house.


The garage has been poured and the small cement slab that goes under our bedroom for storage.



They poured the foundation on May 24th.



We have a hole! They started digging the foundation on May 18th. Micah (4 yrs.) and Ellie (2 yrs) were checking out where their bedrooms are going to be.

We've decided to build a house. Here is our lot (#69) and our new address will be 660 Trail Circle.